November 14, 2008
Toronto, ON
Burka Architects complete designs for Brownstones on Wallace project
Burka Architects Inc. has completed the designs for a townhouse development called Brownstones on Wallace in Toronto.
Located at 351 Wallace Avenue, the old CIL paint plant site, the project includes 134 three-storey units in seven blocks.
Construction is expected to begin late in 2008 on the 14,317-square-meter development.
Rottmann Associates Ltd. (structural) and Rheinland 2000 Ltd. (mechanical and electrical) completed the engineering designs for the townhouses. DJ Campbell Construction Ltd., the construction managers, expect to issue a tender for sub trade pricing late in 2008.
The homes will have a concrete foundation, wood framing, gypsum board interior walls and ceilings and a variety of floor finishes.
– RCD Digital Media
The information above was current at time of publication. To provide an update on this particular project, please send an email to eteamcanada@reedbusiness.com.
| MOST POPULAR STORIES |
- U.S. construction industry accounts for large share of mass layoffs
- Massive Saanich shopping centre redevelopment goes green
- Fraudulent Saskatchewan contractor denied parole
- Key British Columbia industries aim to shape economic stimulus package
- Aecon Group acquires infrastructure construction firm South Rock Ltd.
- 20 Most Popular Stories
| CURRENT STORIES |
- Ledcor crew scales the heights at Art Gallery of Alberta
- Fraudulent Saskatchewan contractor denied parole
- Key British Columbia industries aim to shape economic stimulus package
- South Korea limits number of temporary foreign workers
- Massive Saanich shopping centre redevelopment goes green
- Future Duchess Park Secondary School facility features reduced carbon footprint
- U.S. construction industry accounts for large share of mass layoffs
- Construction, automotive industries reduce utilization rates again in third-quarter 2008
- Aecon Group acquires infrastructure construction firm South Rock Ltd.
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- TYBA Projects (January 5, 2009)
- Ottawa’s Spending and Canada in Afghanistan (December 30, 2008)
- Canada’s Construction Starts through November Demonstrate the Drop in Business Confidence (December 23, 2008)
Lifestyle Blog More 
- The Perils of Driving in the White Stuff (December 29, 2008)
- Economics Humour – Take my Dismal Science, Please (December 22, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- City of Thompson plans new water treatment plant (Dec 30, 2008)
- Quadrangle Architects begins working drawings for new phase of Downtown Markham development (Dec 16, 2008)
- Vanbots begins work on Thompson Rivers University’s House of Learning (Dec 16, 2008)
- Designs for new Corrections Canada office set to begin (Dec 15, 2008)
- Haastown Holdings ready to accept subtrade pricing for Waterscape phase one (Dec 15, 2008)
